Boat move September 21, 2018 The boat moved into the joinery workshop today. She was supported in the hoist while we moved the Dutch Barge into the painting workshop. Read more
Kitchen units September 20, 2018 The kitchen units have arrived and are on the boat ready for installation. Read more
Exterior fittings September 20, 2018 We've drilled and tapped for exterior fittings: roof windows and solar panels. Read more
Plumbing September 20, 2018 Some of the plumbing pipework has been installed and the radiators are beginning to go on. Read more
Lower walls September 11, 2018 The solid oak tongue and groove is now installed on the lower walls. Read more