Skip to main content

Posts

Showing posts from October, 2018

Engine

The engine installation starts.

Electrical installations

The installations are going into the electrical cupboard.

Wallpaper

The wallpaper is up in the saloon...

Galley floor

The floor is down in the galley.

Windows

The windows and portholes are in.

Bedroom

We have constructed the headboard unit and the calorifier is ready to be connected up.

Bulkheads

The three bulkheads are in defining the room spaces.